The inspection team of the Department of Construction of Quang Tri province inspected the work using unburnt bricks and found cracks. Photo: CT |
Using unburnt bricks is cracked
In Hai Phu commune of Hai Lang district (Quang Tri), at the end of 2016 there were 2 state budget projects, Hai Phu Secondary School and Hai Phu Medical Station, built. Both of the above works use unburnt bricks to build according to regulations. However, during the construction process, cracks appeared and were treated. In 2017, 2 projects were handed over and put into use.
“Even though it has been handled, when it was put into use, Hai Phu Secondary School still had cracks. Technical staff said that in the long run, it will crack more because this brick has some compression. Having learned from experience, the project of Hai Phu Primary School had to ask the investor to switch to baked bricks, and the construction process had no problems “- Mr. Truong Cong Van – Secretary of Hai Phu Commune, informed.
Not only in Hai Phu commune, but also in Hai Lang district, many works using unburnt bricks in the construction process have cracks. Mr. Pham Dinh Loi, Vice Chairman of the District People’s Committee, said that the quality of the unburnt bricks used in the construction of the building is now severely cracked. “There is a project that the contractor can’t hand over when the project is finished, I don’t know if it’s because of the grade of this material, or because the concrete marks built with brick material are passed through the unburnt brick material, or because of the temperature.” – Mr. Loi, asked.
In March 2018, the Department of Construction of Quang Tri province established an inspection team to inspect and supervise a number of projects using unburnt materials in the city. Dong Ha (Quang Tri). For example, at the construction of using adobe bricks, which are the Quang Tri Provincial Literature and Arts Association and the Quang Tri Province Radio and Television Station, the inspection team discovered many cracks and separation of masonry at the positions adjacent to the pillars- walls, pillars-beams, some cracks appear in the middle of the wall…
Cannot control the quality of unburnt bricks!
From the Circular regulating the use of unburnt materials in construction works of the Ministry of Construction and the decision approving the plan to develop unburnt building materials in Quang Tri province, dated October 30, 2013 – Provincial Department of Construction This guide has instructions for using unburnt materials according to the route. Accordingly, construction works invested with state capital are required to use 100% unburnt construction materials from 2014 for HCMC. Dong Ha, after 2015 for the remaining areas of Quang Tri province.
According to Mr. Le Cong Dinh, the world currently mainly uses unburnt bricks in construction, only a few countries in Southeast Asia use baked bricks, including our country. Talking about the works that used unburnt bricks, Mr. Dinh said that in 2016, the Department of Construction inspected 15 works in Ho Chi Minh City. Dong Ha, 13 buildings cracked. In Huong Hoa district, when checking 17 works, 90% of the works used unburnt bricks with cracks. “One of the reasons given is the production technology,” Dinh said.
Currently, in Quang Tri, there are 4 factories producing unburnt bricks operating and supplying the market. However, input technology is left loose and unmanaged. All investors go through China and order machines directly. “Four technological lines (of four factories) are not suitable for unburnt bricks, so the product is very difficult to make,” said Mr. Dinh.
Responding to questions and answers from delegates at the 7th session, term VII, term 2016 – 2021, the People’s Council (People’s Council) of Quang Tri province on the above issue, Mr. Nguyen Van Hung – Secretary Provincial Party Committee, Chairman of Quang Tri Provincial People’s Council asked the question: Is the quality of unburnt bricks in Quang Tri area not guaranteed? “Currently, the quality of unburnt bricks has not been controlled, but it has not been confirmed that the quality is not guaranteed,” replied Mr. Le Cong Dinh.
Mr. Nguyen Van Hung requested, the responsibility of the Department of Construction is to control the quality of unburnt bricks to decide whether to put them into use or not. “If the product of this investor does not guarantee the quality, then use the product of another investor” – Mr. Nguyen Van Hung, emphasized.
According to Labor